In the left railgun assembly I still need to use the following parts : B (Gold), D (White Gold), F1 (Metallic Gray), F2 (Metallic Gray), G (Gold) x2, A (Multi-coloered), E1 (White), H1(Black), H2(Black),J1 (Light Gray), J2 (Light Gray), K1 (Light Blue), K2 (Light Blue), L1(Red), L2(Red), Metal 3D Sticker and Railgun Part 1 completed .
This is my finished video of the mgex strike freedom left railgun The assembly process is done from minute 6 to minute 11.
The finished part 1 is assembled into the pin of part number E1-35 in the front, the finished part number 2 is assembled into the pin of part number E1-35 in the back. For the scope part of the railgun, I will assemble part number F1-28 into the inside of part number J1-22, part number A2-3 will be assembled into the outside of part J2-22 which is the lens part, assemble this finished part into the middle slot of part number E1-35. Assemble part number E1-33 to the outside to match the pin of part number E1-35, assemble part number G-44 into the outside pin of part number E1-33, fold the finished railgun back. Assemble part number J1-4 into the hole of part number E1-35, part number J1-21 will be assembled into the middle hole of part number E1-35, thus completing the assembly.
MGEX Strike Freedom - Part E1-35
MGEX Strike Freedom - Part E1-35 connect Part finish 1
MGEX Strike Freedom - Part E1-35 connect Part finish 2
MGEX Strike Freedom - Part E1-35 connect Part finish 1,2
MGEX Strike Freedom - Part J1-22
MGEX Strike Freedom - Part F1-28
MGEX Strike Freedom - Part F1-28
MGEX Strike Freedom - Part F1-28
MGEX Strike Freedom - Part A2-3
MGEX Strike Freedom - Part A2-3
MGEX Strike Freedom - Part scope
MGEX Strike Freedom - Part E1-33
MGEX Strike Freedom - Part E1-33
MGEX Strike Freedom - Part G-44
MGEX Strike Freedom - Part G-44
MGEX Strike Freedom - Part G-44
MGEX Strike Freedom - Part G-44
MGEX Strike Freedom - Part J1-4
MGEX Strike Freedom - Part J1-4
MGEX Strike Freedom - Part J1-21
MGEX Strike Freedom - Part J1-21
MGEX Strike Freedom - Part J1-21
MGEX Strike Freedom - Left Railgun Completing
I have finished assembling the railgun part of the mgex strike freedom on the left side, everything went well, only the binocular assembly part had a few small details that made me confused during the assembly process, but in the end, I still finished it, I will continue the assembly process in the next posts.